نوع مقاله : مقاله پژوهشی
نویسندگان
1 گروه مهندسی عمران، دانشگاه قم
2 گروه مهندسی عمران دانشگاه قم
چکیده
کلیدواژهها
موضوعات
عنوان مقاله [English]
نویسندگان [English]
Differential settlement in structures not only causes architectural and serviceability issues, but also induces internal forces and bending moments exceeding permissible thresholds within structural elements. Re-leveling structures suffering from differential settlement is often essential depending on their significance and age. In this study, through a representative case study, the step-by-step procedure for re-leveling structures undergoing asymmetric settlement using hydraulic jacks is comprehensively detailed. In addition to outlining the practical execution challenges, key structural assessment considerations required during the design of the re-leveling system are clarified. The findings indicate that in formulating the re-leveling scheme, geotechnical considerations must be evaluated first. Subsequently, the superstructure must be fully modeled, and the required number and capacity of jacks beneath each column must be determined based on the settlement mechanism. The jacking-induced displacements applied beneath the foundations must be executed incrementally, establishing allowable displacement limits at each stage to prevent inducing stresses beyond the structural components’ capacity. A 14-stage re-leveling scheme utilizing approximately 16 hydraulic jacks installed beneath columns was developed. Over a 10-day period, the re-leveling operation successfully eliminated 35 cm of differential settlement.
کلیدواژهها [English]
ارسال نظر در مورد این مقاله